Dock Tugs

Criteria / DescriptionHarbor Dock Tug with approx. power of 2000 kW
Project 21540
Harbor Dock Tug with approx. power of 4000 kW
Project 21450
Photo
Purpose of ship
  •  Support of towing and docking operations during mooring, harbor and unhabor of ultra large sea going tankers;
  • ​ Fire extinguishing on board vessels, including tankers;
  •  Participation in containment of accidental oil spill - laying of boom defenses in oil spill area;
  • ​ Scrabbling of ice off the vessels and jetties

​ 
  • Debarkation of fire team on board a vessel in distress and rescue of her crew
Class of ship
КМ  Arc5 R2 AUT3 FF3WS Tug 
Tug of the Russian Maritime Register of Shipping.
КМ  Arc5 R2 AUT3 FF3WS Tug 
Tug of the Russian Maritime Register of Shipping.
Navigation zoneHarbor, roadstead and near-shore operations within boundaries of navigation area R2
Basic performances
length, m 
- maximum 
- molded

28.0 
23.0

34.0 
29.0
width, m9.011.60
summer draft, m3.64.68
Sea endurance, days

- in terms of fresh water capacities66
- provision66
- fuel and oil1212
Speed, knots12.014.0
Draw-bar pull, ton of force (tf)3068
Crew, men3+3 (spare berths)6
Power propulsion plant 
- main engine
Two shafts power propulsion plant, each of which is operated from propulsion steering unit driven into rotation by diesel
Power 
- main engines, kW 
- diesel-generators ,kW 
- emergency diesel generator, kW

2х1015 
2х130 
30

2х2025 
2х170 
30
Cargo handling gearHydraulic operated crane with a folding boom which got a handling radius of 14 meters and approx. capacity of 1.0 ton of force
Fine main system 
- Centrifugal pumps 
- Fire fighting monitors
Q = 750 m3 / hr P = 1.2 MPA, – 2 pcs. in number 
Q = 500 m3 / hr, P = 1.2 MPa, – 2 pcs. in number

Q = 800 m3 / hr, P = 1.2 MPa, - 2 pcs. in number 
Q = 500 m3 / hr, P = 1.2 MPa, – 2 pcs. In number
Equipment for dewatering of disabled vessels 
- Portable submersible pump with electric drive 
- Portable submersible water jet blower (eductor)


Q = 250 m3 / hr, – 1 pc. in number 
Q = 250 m3 / hr, – 3 pcs. in number.


Q = 250 m3 / hr, – 2 pcs. in number 

Q = 250 m3 / hr, – 2 pcs. in number